Programme Duration: 30 weeks Value: £2,400,000 Project Details: The project comprised of the re-providing of the existing airfield facilities currently located within the footprint of a new Operating base. Hannafin are responsible for the complete work package which includes the emptying and de-commissioning of four buried and twelve semi-buried de-icing waste fuel and diesel storage tanks. De-commisioning of an existing substation, screening and crushing concrete for future use, approximately 5000m2 of concrete parking areas, street furniture, anti-intruder fencing, soft landscaping, diversion and new HV and LV electrical distribution services, new underground storm and foul water installations including attenuation and interceptor tanks, manholes and drianage channels. The supply, installation and commissioning of six new storage tanks, associated control systems, builders work supply and installation of a 900m2 steel frame POL store for inflammable materials.
Project Title: NHS Llandough Mental Health Facility
Programme Duration: Value: Project Details: After completing the temporary works package installing a temporary access road, temporary carpark and diverting services; we were awarded the main project works for the completetion of 3 new outpatient terminals and stroke unit together with internal landscaped courtyards, new access road and retaining structures.
Project Title: Wolverhampton Interchange
Programme Duration: Value: Project Details: The completion of In-situe concrete beams, bases, and slabs for a fast tempo intensive building schedule within a busy city centre. Instalation of Foul and storm water systems including RWH tank and attenuation. Surfacing, exposed fairfaced concrete structures and street furniture.