8th February 2012

Commercial

Project Title: Vue cinema 16 re-inforced concrete auditorium, Oxford

Programme Duration: 8 weeks
Value: £400,000
Projects Details: Re-inforced concrete works to oxford Leisure complex, plant room decks and cinema areas. During project completion 16,000m2 of concrete flooring and re-inforced conrete auditoriums all poured in one hit.

Project Title: Tesco, Newport

Programme Duration: 32 weeks
Value: £1,900,000
Projects Details: Re-inforced concrete structual foundations troughout, Re-inforced concrete floor bed. A Large reinforced base for Lorry access delivery ramp. Complete foul and storm water below ground installation including 3 attenuation tanks totaling 1800m3, below ground services. External finishes comprising of precast concrete kerbs, concrete paving and street furniture.

Project Title: Tesco, Eston

Programme Duration: 24 weeks
Value: £1,250,000
Projects Details: A large groundworks, substructures and external finishes project, consisting of insitue concrete bases to carry the buildings Steel and Glu-lam structure; Instalation of precast concrete ground beams, all foul and storm drainage including some large 525 diameter runs. Cast a 57m retaining wall and 2500m2 concrete service yard. Finally the preparation of 35,00m2 of existing ground to take external finishes including 12,000m2 of block paving, 5,000m of kerbs, tree pits and gabion walls.

Project Title: Nottingham Park Hotel, Nottingham

Programme Duration: 23 weeks
Value: £1,100,000
Projects Details: A substantial sub-structures and groundworks package, Including mass filled bases, basement and ground floor level retaining walls, re-inforced slabs, Stair and lift bases, insulation and waterproofing, instalation of two large attenuation tanks as well as profiling of large proposed car park and access road. We are due to return for a second phase to lay and intall external finishes and street furniture.