Programme Duration: 8 weeks Value: £400,000 Projects Details: Re-inforced concrete works to oxford Leisure complex, plant room decks and cinema areas. During project completion 16,000m2 of concrete flooring and re-inforced conrete auditoriums all poured in one hit.
Project Title: Access Road and Enabling Works, Whiteleigh
Programme Duration: 15 weeks Value: £1.200.000 Project Details: The project comprised the construction of a new two lane single carriageway road connecting the existing Whiteleigh Primary School east to the B3372 Tamerton Road. Hannafin was responsible for the complete Section 278 package. This involved forming a 14m wide cutting, excavation and removal of 30,000m3 of excavated spoil from site including soil nailing and general ground treatment works. The complete construction of a 250m long two way tarmac surfaced carriageway incorporating drainage, street lighting, statutory street signage and inclusion of all temporary traffic management during the construction period.