The project comprised of the re-providing of the existing airfield facilities currently located within the footprint of a new Operating base.
Hannafin are responsible for the complete 'Turn Key' work package which includes
- emptying and de-commissioning of four buried and twelve semi-buried de-icing waste fuel and diesel storage tanks.
- De-commisioning of an existing substation, screening and crushing concrete for future use
- approximately 5000m2 of concrete parking areas
- Hard Landscaping including street furniture, anti-intruder fencing,
- soft landscaping,
- diversion and new HV and LV electrical distribution services,
- New underground storm and foul water installations including attenuation and interceptor tanks, manholes and drianage channels.
- The supply, installation and commissioning of six new storage tanks, associated control systems, builders work supply
- Installation of a 900m2 steel frame POL store for inflammable materials.