Case Study

A Redevelopment of the existing Bishop Centre into a new retail park consisting of 140,000 sq ft of new retail space, anchored by a 55,000 sq ft Tesco store & Home Sense and other leading brands stores

Integral to these works were major foul drainage and storm drainage works, all of which was retained on-site through a series of soakaway tanks

The main Scope included;-

  • •Earthworks
  • •Substructure
  • •Drainage
  • Concrete Service Yard
  • Hard Landscaping
  • External Furniture
  • BWIC External M&E requirement

The project was delivered safely and on time within the constraints of a live, and very busy, public realm