A brand new multi-million-pound state of the art sport and leisure center project on land that will be transformed into a parkland leisure destination. Trim trail, pedestrian and cycle access along with the leisure center which will house many more features
A new distribution station facility for Amazon to service the South West area of the UK. Packages will be shipped to the delivery station in Parc Erissey Industrial Estate from Amazon fulfilment and sortation centers and loaded onto vehicles to get delivered to customers.
A new development of luxury houses and lodges in 78 acres of Parkland in Warwickshire, creating an age-exclusive village community including Country Club style facilities.
An extension to the Northampton General Hospital entrance, road realignment, revised parking, and landscaping improvements to create a significant enhancement to the hospital and environment.
Groundworks and civils to construct the Midland Metropolitan Hospital, a brand new state of the art hospital.
A grade 1 listed building, after 7 years planning was granted permission to be converted in to a 80-bedroom Luxury hotel and natural mineral water spa.The Pump Room served as an information centre for the duration of the project then was converted into a cafe.
278 works on a main artery within the centre of Birmingham without which the redevelopment of the whole area and building demolition would not have been possible.
Canalside regeneration including a waterside residential quarter with retail and leisure spaces. The Icknield centre includes: Eight-lane, 25-metre competition pool, 250-capacity spectator seating area, Learner Pool, Steam Room, Sauna, Fitness Suite, Dance Studio, Wet and Dry Changing Facilities
Extension to the Global HQ of Jaguar Land Rover, of 9,250 sq ft over three floors, with associated test facilities, equipment and office space including a 220 space car park. This will also enable creation of a specialist storage system and airflow laboratory.
Construction of a prestigious new ‘Head Quarters / Operations building, test track and storage facility for Jaguar Land Rover.
New build, three storey, steel frame structure on the abandoned site of the original 12 acre, Grade 2 listed, former Springfield Brewery.
Delivery of a Partnered Framework Approach to construct 5 new-build school facilities in and around Birmingham & Dudley,
New leisure centre on site of demolished old leisure centre. The new centre will be run by Birmingham Community Leisure Trust. The facility includes: 25 metre, 6 lane swimming pool Training/Learner pool Changing Facilities Fitness Studio Dance Studio
To complete substructures and drainage to 12nr mainly two storey residential blocks across three separate sites within the existing Beacon Barracks MoD base.